3rd Annual Wind Power Mexico


Overview

When: 05/29/2013 - 05/30/2013

Time: 08:30 am - 06:00 pm

Location: CAMINO REAL POLANCO MÉXICO

Get driving directions »

Contact Information

Mexico 11590

Website: http://www.bit.ly/WindMexicoLCE

E-mail: send an e-mail

Contact Name: Bryony Abbott

Phone: +44 (0) 203 355 4216

Photos

Profile

In 2012, Mexico posted a massive 119% increase in installed wind-power capacity, more than doubling the 519 megawatts it had in 2011- one of the world’s highest annual growth rates. With the government backing a target for 12GW installed capacity by 2020, join us at Wind Power Mexico and place your organization at the forefront of the market.

http://bit.ly/WindMexicoLCE